Skip to main content
Message Font: Serif | Sans-Serif
 
No. of Recommendations: 0
"When the HTS wires (which don't require absolute zero) prove themselves, they can be pulled through the conduits in place, and automatically the load carrying capability increases many times."

Jim,

Won't HTS wires still need to be surrounded by cooling liquids even if they do not require absolute zero? I assume that there will still be a need for significant retrofitting of the existing conduits. I do believe that any new subdivisions could/should be built with HTS in mind, but older underground systems will need a lot of work.

I own a small holding in AMSC, with plans to add to it over the next while as information becomes available.

Thanks for the informative posts,

Paul


Print the post  

Announcements

What was Your Dumbest Investment?
Share it with us -- and learn from others' stories of flubs.
When Life Gives You Lemons
We all have had hardships and made poor decisions. The important thing is how we respond and grow. Read the story of a Fool who started from nothing, and looks to gain everything.
Contact Us
Contact Customer Service and other Fool departments here.
Work for Fools?
Winner of the Washingtonian great places to work, and Glassdoor #1 Company to Work For 2015! Have access to all of TMF's online and email products for FREE, and be paid for your contributions to TMF! Click the link and start your Fool career.